The scope of works included the complete demolition and removal of existing structures, followed by the installation of a high-quality, functional fit-out that met the specific needs of the building. Key elements of the project included the creation of a modern, welcoming lobby area, the refurbishment of both male and female bathrooms, and a staircase infill to optimise the building's layout and accessibility.
With an emphasis on design integrity and operational efficiency, the project was delivered within a stringent 12-week timeframe, showcasing our ability to meet deadlines while maintaining high standards of quality and workmanship throughout